Beigman Engineering

Office fit-out · JLL · Heatherton, Victoria

Metcash office fit-out in Heatherton

Beigman Engineering supported JLL on the Metcash offices at 19 Corporate Drive, Heatherton. As part of the proposed lease and fit-out, the tenant wanted to accommodate more people than the existing Occupancy Permit allowed.

The challenge

The proposed increase in occupancy needed to be considered against the constraints of the existing building, including its available fire-isolated stairways. The team needed a fire engineering assessment that addressed those limits as part of the planned office fit-out.

Beigman's work

Beigman used computational evacuation modelling to assess occupant movement and support the proposed occupancy. The work provided a technical justification for the requested increase within the existing building arrangement.

The outcome

The tenant was able to proceed with the lease and its internal fit-out without constructing an additional stairway or undertaking other intrusive building works. The fire engineering work addressed the occupancy question in the context of this building and its existing escape routes.

Discuss a fit-out or change of use

Send the proposed layout, intended use and occupant numbers, together with the existing Occupancy Permit and any building surveyor comments. These details help establish what needs to be assessed before the design progresses.

Discuss your project with Beigman

Send your project details and available drawings, or call to discuss what you need.

Monday–Friday, 9:00 am–5:30 pm, Melbourne time. Meetings by appointment.