Fire engineering Performance Solutions in Melbourne

A building design does not always fit the standard fire safety provisions. Beigman Engineering develops fire engineering Performance Solutions for Melbourne projects, assessing a proposed approach against the safety requirements that apply to the building.

We help architects, developers and project consultants understand the options and the evidence needed to support a design decision. The aim is to address the fire safety question while considering how the building will be designed, built and used.

Discuss your project

What is a Performance Solution?

The National Construction Code (NCC) sets performance requirements for buildings. Its Deemed-to-Satisfy provisions, often shortened to DTS, describe standard ways of meeting those requirements. A Performance Solution uses a different, assessed approach to demonstrate that the relevant requirements are met.

It is a project-specific assessment. A solution used on another building cannot simply be assumed to suit yours.

Design questions we can assess

Beigman's fire engineering services include assessing design proposals involving:

  • Glazed fire separation, where the team wants to retain glazing within the design.
  • Travel distances, where escape routes need assessment beyond the standard provisions.
  • Fire resistance levels, where the proposed level needs supporting justification.

From the design question to the evidence

We review the proposal and discuss the scope with the relevant project parties. This helps establish the design brief: what is being assessed, which requirements apply and how the proposal will be evaluated.

The assessment may involve calculations, modelling or other supporting evidence suited to the issue. The resulting fire engineering report records the approach, findings and conditions. If the assessment identifies changes that are needed, the team can consider those before progressing the design.

Bring the project team into the discussion early

Early discussion gives your architect, building surveyor and other consultants an opportunity to coordinate the fire safety approach. Send the latest drawings, the proposed departure from the standard provisions and any comments already received. Include the project address and design stage so the initial discussion has the right context.

Common questions

Does a Performance Solution guarantee approval?

No. The proposal needs suitable supporting evidence and must go through the relevant assessment and approval process. Its suitability depends on the building and the design being assessed.

Can one solution cover several design issues?

Several related issues may be considered together, but their interactions need to be understood. We review the proposed scope with your team before deciding how the assessment should be organised.

Further reading

Talk through your design challenge

Share your drawings and the fire safety question your team is working through. We can discuss what needs to be assessed.